Main page | Realisations | 2011 Filharmonia Świętokrzyska w Kielcach

2011 Filharmonia Świętokrzyska w Kielcach

On January 19, 2012, the grand opening of the International Cultural Center – the new headquarters of the Świętokrzyska Philharmonic named after V. I. Shishko-took place.Oscar Kohlberg, whose history dates back to 1920. The new building has a multifunctional concert hall, a chamber hall with 200 seats, a concert courtyard, a library and a foyer with the possibility of allocating a rehearsal hall. The concert hall is a special place-in addition to concerts, opera performances, musicals and ballet, filmow shows can also be held here.Na need for investment P. S. The theater performed works related to the supply, installation and commissioning of equipment for the technological equipment of the newly built stage in the Philharmonic Hall.Oskar Kohlberg in Kielce.The works included m.in. transport hatch with Spirallift drive, stage mechanical equipment drive control system.The technological stage lighting system was created on the basis of spotlights of the Italian brand Spotlight: Vedette 12 x 4, Vario 25 PC x 6, Vario 12 PC x 15, Arena 12 Fresnel x 10, ETC Source Four Zoom x 10 profile spotlights and DTS moving heads: 4 x XR 5 Spot, 2 x XR 5 Wash. Lighting is controlled using the Lighting Palette VL 64/1000 Strand Lighting control panel. An assembly of six Wallrack Strand Lighting thyristor regulators was also installed.Za Audience lighting control corresponds to the HDL Bus Pro system. Control is carried out using a desktop operating and unregulated in the cockpit and at the mastermind post. We have also created a multimedia projection system at the Świętokrzyska Philharmonic.

2011 Filharmonia Świętokrzyska w Kielcach

Other implementations