Main page | Portfolio | 2006 Wilam Horzyca Theatre in Torun

2006 Wilam Horzyca Theatre in Torun

The theatre is housed in one of the most beautiful historic theatre buildings in Poland, built in 1904. In 2006, a six-year reconstruction of the theatre was completed, during which P.S. TEATR carried out a comprehensive modernisation of the stage. During the three-month summer break, 31 fly bars and three lighting bars were installed, and the portal bridge was upgraded with an electric drive. A drive unit for the fire curtain was also installed, together with a proscenium structure that allows the stage to be extended, the auditorium enlarged or an orchestra pit created. The modernisation also covered stage lighting equipment and installations comprising more than 120 fixtures, a computer lighting console, digital dimmers and effect devices, as well as electroacoustic equipment and a new stage manager’s communication system. The work also included replacing the stage floor, the non-combustible covering of the technical ceiling and the stage fly galleries. Mobile equipment was also supplied: a roofed stage, aluminium platforms, lighting and sound equipment, and drapes. The theatre modernisation was designed by a team of engineers: Tomasz Zaborowski (stage lighting and electric drives for the stage machinery), Małgorzata Bober and Mirosław Łysik (stage machinery), Krystyna Ignaczak (electroacoustics) and Krzysztof Pawłowski (structures).

2006 Teatr im. Wilama Horzycy w Toruniu

Other projects