Main page | Portfolio | 2011 Musical Theatre in Lodz

2011 Musical Theatre in Lodz

On 1 October 2011, after a four-year general renovation, the modernised home of the Musical Theatre in Lodz was opened. The renovation and modernisation, designed by Prof. Józef Chmiel, architect, covered every part of the building. A right-hand side stage, plant rooms, a ballet studio with dressing rooms and washrooms, service rooms and a ballet costume store were added to the stage area. A new orchestra rehearsal room was created, the balcony in the main auditorium was reshaped, and new seats and carpeting were installed. The stage technology was designed by Jerzy Gumiński, MSc Eng., together with Tomasz Zaborowski, MSc Eng. P.S. TEATR designed and equipped the Musical Theatre in Lodz with stage lighting, stage machinery and electroacoustic equipment. The stage lighting work was managed by Tomasz Zaborowski, the stage machinery was designed by Małgorzata Bober, and Jan Walentowski managed the work on the drive control system. The stage lighting is controlled by ChamSys MagicQ 200 and MagicQ 100 consoles from the British brand ChamSys, connected to an advanced media server that fully synchronises projection from a 15,000 ANSI lumen EIKI XGA projector. Conventional fixtures are dimmed by more than 300 digital dimmers, including sine-wave dimmers, from State Automation – a world leader in dimmer manufacturing. The lighting rig comprises more than 240 fixtures, including Spotlight spotlights (12 × Combi 25 Zoom, 6 × Figura Zoom 25, 60 × Vario 12 PC, 50 × Vario 25 PC), 103 ETC Source Four profile spotlights, as well as intelligent lighting – Vari*Lite moving heads (8 × VLX and 6 × VL1000 TSD ERS), DTS and SGM LED floodlights and, for the first time in Poland, Seachanger fixtures based on plasma lighting technology. The stage machinery includes a total of 37 fly bars (scenery and lighting), 3 lighting bridges, 9 spot hoists, a transport lift and a mobile revolving stage. The drive system is based on microprocessor controllers. All machinery is operated from a computer control desk that allows selected drives to be controlled. The desk, with a 15-inch touch screen, allows precise setting of movement parameters such as speed, positioning, braking distance and synchronisation with other drives, as well as monitoring the status of all drives. To ensure the highest level of safety, the system is equipped with a set of emergency stop buttons located on the stage, in the switch rooms and on the technical ceiling. The theatre’s auditorium seats 850. The modern equipment and installations at the Musical Theatre in Lodz make it possible to stage the most demanding productions.

2011 Teatr Muzyczny w Łodzi

    Other projects