2013 Musical Theatre in Gdynia
The Danuta Baduszkowa Musical Theatre in Gdynia was equipped in three phases, covering the Chamber Hall and the Main Hall. The Musical Theatre in Gdynia has been operating since 1958 and is a special institution for our company, as it is linked to the very beginnings of P.S. TEATR. In 1970, the architectural design of the theatre by Daniel Olędzki, architect, and Prof. Józef Chmiel, architect, was selected. Construction began in 1971, but a problem then arose with the subcontractor responsible for the technical designs. In response, Jerzy Gumiński, MSc Eng., together with the authors of the architectural design – Prof. Józef Chmiel and Daniel Olędzki – set up his own Specialist Design Team. Outstanding specialists were also invited to join: Dr Witold Straszewicz, Eng., Wilhelm Staszewski, Eng., and Wiesław Kinderman, Eng. This group began work on new designs that implemented solutions that were innovative for their time. Construction of the Musical Theatre was completed in 1979, and the theatre quickly became one of the most important and popular cultural institutions in the Tri-City. The P.S. TEATR team also took part in the reconstruction and modernisation of the building that began in 2010. The extension was designed by Prof. Józef Chmiel, architect; the stage technology by Jerzy Gumiński, MSc Eng.; the stage lighting and drives by Tomasz Zaborowski, MSc Eng., who was also the site manager; and the stage machinery by Małgorzata Bober, MSc Eng. The modernisation included, among other things, building the New Stage from scratch and enlarging the auditorium of the Main Stage, making it the largest musical theatre in Poland. Its auditoriums can seat almost 1,600 people in total (Main Stage – 1,070, New Stage – 360 and Chamber Hall – 150). Under the contract for the comprehensive technical fit-out of the stages in the Chamber Hall and the Main Hall, P.S. TEATR supplied 62 moving heads from Vari*Lite (VL3500Q Spot and VLX) and DTS (XR 3000 and NICK), 60 Philips Selecon PL3 LED spotlights, 120 Selecon (SPX) and Spotlight (Evolution) profile spotlights, 24 conventional fixtures and 8 Spotlight Vedette followspots. The equipment is complemented by a 15,000 ANSI lumen video projector. The stage lighting system, powered by digital ETC Sensor dimmers for more than two hundred circuits, makes it possible to stage the most demanding productions. The control system for the house lighting and non-dimmed circuits of the Main Stage, the New Stage and the foyer is based on a modern HDL BUS Pro system, which allows each circuit to be controlled automatically, individually or in groups according to pre-programmed scenes, from multiple access points. The HDL system uses DMX to control the halogen house lighting and decorative LED lighting. The main stage of the Musical Theatre in Gdynia was fitted with a Spiralift-driven proscenium lift with a lowering three-section balustrade. A total of 13 motorised fly bars were installed above the auditorium and in the proscenium area, and 11 new motorised fly bars above the stage; 30 manual fly bars were modernised and the drives of two revolving stages were replaced. The New Stage was equipped with an innovative machinery system whose main elements are 15 electric spot hoists mounted on computer-controlled gantries, allowing each hoist to be positioned anywhere above the stage and auditorium. In addition, 5 fly bars (two lighting bars and three in the proscenium) and 8 Trabes DIVO chain hoists were installed. The drive system is based on microprocessor controllers. All equipment is operated from a computer control desk with a 15-inch touch screen, which allows precise setting of movement parameters such as speed, positioning, braking distance and synchronisation with other drives, as well as monitoring the status of all drives.